White River at Harding Portfolio Section - 7
[#Beginning of Shooting Data Section]
Nikon COOLPIX995
2003/04/04 11:00:11
JPEG (8-bit) Fine
Image Size:  2048 x 1536
Color
ConverterLens: None
Focal Length: 8.2mm
Exposure Mode: Programmed Auto
Metering Mode: Multi-Pattern
1/142.7 sec - f/3.7
Exposure Comp.: 0 EV
Sensitivity: Auto
White Balance: Auto
AF Mode: AF-C
Tone Comp: Auto
Flash Sync Mode: Not Attached
Digital Zoom Ratio: 1.00
Saturation comp: 0
Sharpening: Auto
Noise Reduction: OFF
[#End of Shooting Data Section]
[#Beginning of Shooting Data Section]
Nikon COOLPIX995
2003/04/04 11:11:31
JPEG (8-bit) Fine
Image Size:  2048 x 1536
Color
ConverterLens: None
Focal Length: 8.2mm
Exposure Mode: Programmed Auto
Metering Mode: Multi-Pattern
1/96.4 sec - f/3.3
Exposure Comp.: 0 EV
Sensitivity: Auto
White Balance: Auto
AF Mode: AF-C
Tone Comp: Auto
Flash Sync Mode: Not Attached
Digital Zoom Ratio: 1.00
Saturation comp: 0
Sharpening: Auto
Noise Reduction: OFF
[#End of Shooting Data Section]
[#Beginning of Shooting Data Section]
Nikon COOLPIX995
2003/04/10 10:27:25
JPEG (8-bit) Fine
Image Size:  2048 x 1536
Color
ConverterLens: None
Focal Length: 8.2mm
Exposure Mode: Programmed Auto
Metering Mode: Multi-Pattern
1/343.4 sec - f/6.7
Exposure Comp.: 0 EV
Sensitivity: Auto
White Balance: Auto
AF Mode: AF-C
Tone Comp: Auto
Flash Sync Mode: Not Attached
Digital Zoom Ratio: 1.00
Saturation comp: 0
Sharpening: Auto
Noise Reduction: OFF
[#End of Shooting Data Section]
White River at Harding Portfolio Section - 3
[#Beginning of Shooting Data Section]
Nikon COOLPIX995
2003/04/15 10:22:00
JPEG (8-bit) Fine
Image Size:  2048 x 1536
Color
ConverterLens: None
Focal Length: 8.2mm
Exposure Mode: Programmed Auto
Metering Mode: Multi-Pattern
1/250 sec - f/5.3
Exposure Comp.: 0 EV
Sensitivity: Auto
White Balance: Auto
AF Mode: AF-C
Tone Comp: Auto
Flash Sync Mode: Not Attached
Digital Zoom Ratio: 1.00
Saturation comp: 0
Sharpening: Auto
Noise Reduction: OFF
[#End of Shooting Data Section]

Project Description:

Phase I:  A Design/Build project to install a Sanitary Sewer below the White River.  The project included a large diameter siphon barrel below the White River as well as inlet and outlet structures and inter-connecting sewers.  This phase also included United States Army Corps of Engineers (USACE) levee excavation and reconstruction.

Phase II:  United Consulting also designed this phase of the project.  This phase included installation of the second barrel of the siphon below the White River as well as odor control facilities, building and site improvements.

Approximate Project Cost:

Phase I:  $1,700,000

Phase II:  $1,100,000 

Breadth of Services Provided:

Phase I:   Survey, Design Review, and Construction Inspection

Phase II:   Survey, Design Engineering, Permitting, and Construction Inspection