wabash-headworks_pa240035
wabash-headworks_1928
wabash-headworks_100028
wabash-headworks_img_20151104_143659
wabash-headworks_p1110030
wabash-headworks_p4140036
wabash-headworks_pa240024
wabash-headworks_pa240026
wabash-headworks_pa240040
wabash-headworks_pa240052

Project Description: The project included pumping and screening upgrades at a headworks facility with hydraulic capacity of 30 MGD. The existing headworks structure was reconfigured following the removal of two screw pumps with the addition of parallel fine mechanical screens, dual washer compactors, four submersible pumps with variable frequency drives (VFDs) and automated controls, slide gates, a trolley hoist assembly, and headworks screening building. Floatables and debris entering the plant were reduced, as well as improved reliability, control, and monitoring of pumping operations. The original/overall design was also provided by United staff in the 1990s.

Approximate Construction Cost: $2,100,000

Breadth of Services Provided: Design Engineering, Bid Assistance, Construction Administration