Project Description:  The City’s existing lift station that conveyed wastewater for a large portion of the north side of Terre Haute was beyond its design life and in need of replacement.

United Consulting designed the new facility with a design capacity of 20 million gallons per day including a new, cast-in-place concrete structure, masonry building, submersible pumps with VFD controls, dual mechanical screen equipment, and other necessary improvements.

Approximate Project Cost:  $5,500,000

Breadth of Services Provided:  Survey, Land Acquisition, Design Engineering, Permitting, and Construction Administration