Project Description:  The project involved the creation of a new roadway on new alignment and the widening of SR 61 to add a right-turn lane onto the new roadway.  A northbound passing blister was added on SR 61 for left-turning vehicles onto the Hart Street Connector (Bierhaus Boulevard) from northbound SR 61.

Approximate Project Cost:  $2,400,000

Breadth of Services Provided:  Engineer’s Report, Survey, Environmental Services, Regulatory Permit Management, Roadway Design, Hydraulic Design, Sanitary Sewer Design,  Right-of-Way Engineering, and Construction Inspection