CLIENT:
|
Indiana
Department of Transportation
|
| |
|
PROJECT
LIMITS :
|
The
project limits include two interchange modifications,
and three INDOT Bridges. The road reconstruction was
2434 feet for Grant Street, 2388 feet for Broadway
Street, and 1800 feet for Martin Luther King Street.
|
| |
PROJECT
SCHEDULE :
|
Start
Plan Development :
December 5, 2002
Final Tracings Submitted :
September 2, 2003
Letting : December 19, 2003
|
| |
APPROXIMATE
CONSTRUCTION COST:
|
$
21,500,000
|
| |
|
|
| PROJECT
SCOPE : |
The
project scope includes design of two interchange modifications:
I-80/94 and Grant Street, and I-80/94 and Broadway Street.
The
design of the replacement bridges: Grant Street over
I-80/94 (Structure No. I-80-9-8091), Broadway Street
over I-80/94 (Structure No. 53-45-8466), and Martin
Luther King Street over I-80/94 (Structure No. I-80-11-8056).
The
design also included unsuitable soil remediation, complex
signing, and noise barriers
|
| |
| |
| SERVICES
PROVIDED BY UNITED: |
Design
– Road and Signing, Contract Documents, Permits,
Bid Support, Post Bid Plan Review, Final As-Built Plan
Review
|
|